Case Studies

PT. Unilever Indonesia's Approach to Reducing Industrial Air Emissions

  • Client: PT. Unilever Indonesia
  • Unit Services: Tool and Equipment
  • Application: Production Equipment
  • Location: SIER, Surabaya, Jawa Timur
  • Year: 2022
  • Project Duration: 14 Months
  • Status: Completed

Air Pollution Control Strategies at PT. Indofood Sukses Makmur

  • Client: PT. Indofood Sukses Makmur
  • Unit Services: Dust Collector
  • Application: Food and Beverages
  • Location: Beji, Pasuruan, Jawa Timur
  • Year: Production Line
  • Project Duration: 6 Months
  • Status: Completed

PT. Astra International's Role in Combating Vehicle Emissions

  • Client: PT. Astra Internation
  • Unit Services: Dust Collector
  • Application: Sandblasting Room
  • Location: Cikarang MM2100 Bekasi
  • Year: 2020
  • Project Duration: 6 Months
  • Status: Completed

PT. Pertamina's Air Quality Management in Refinery Operations

  • Client: PT. Pertamina
  • Unit Services: Vacuum and Material Transfer
  • Application: Production Line
  • Location: Medan, North Sumatera, Indonesia
  • Year: 2019
  • Project Duration: 9 months
  • Status: Completed